Thursday, June 09, 2011

Well #1 done at last!

We have finally gotten the first well bored! It took quite awhile and I think some lessons were learned in the process. Now that the hole is 340 feet into the ground, the ground loop tubing has been inserted. In the photo below you see the last 8 feet or so that remains above ground to be connected later. They need to pour a cement mixture into the hole next, locking the tubing in place and assisting with heat transfer to the soil. Once done, the remaining steel goes away so it can be buried and invisible.



The trench we dug to hold the byproducts of drilling (water and sand) has been filling up. Normally you wouldn't see this much debris, but when the sides of the well cave in, extra sand comes out.



The drilling rig has been moved forward and re-set for the next bore. Note how 'clean' the area around the hole begins. The steel tube goes in and there's nothing around it...yet.


I hope that wells #2 and #3 can go much more quickly than the first. We would like our driveway back and the system in place soon!

Sunday, June 05, 2011

Boring, boring, boring


The title is both descriptive of the action and the result. We've been at this for a few weeks now and we're not making stellar progress. We need three wells, each about 340 feet deep, for the heat exchanger piping. We are still on well number one, and not very far along at that.

Our soil seems to be quite sandy and the sides of the well keep caving in and the water used to remove the drilling waste erodes the sides of the well into a cavern. To counter this, the driller must fill the hole with cement until it starts to rise up the hole, then let it harden and drill through it in an attempt to get past the eroded area. It's sort of a three steps forward an two steps back dance here. We have been as deep as 105 feet, but as of Friday we were back to about 85-90 feet with about 75 bags of cement used to fill the hole.

Yes I am concerned about the lack of progress.

Let's hope this week is a breakthrough (pun intended) and we get past the soft soil and hit some good hard dirt or even rock. I'd like to get this project done, and the drill rig in the driveway keeps us from parking in the garages. Heck, we have to park on the north side of the house and hike across the dry creek to get to the front door. That's especially fun when it's pitch dark and you have bags of groceries...

Updates when something changes!

Monday, May 30, 2011

Pearl & Licorice Have a "Girl's Day" Out in Sedona

First, let me say I was just along as the "pup-arazzi photographer"! Deb and Emily engineered the event...a "Girl's Day Out" for my Pearl and Emily's Licorice Roo. They decided to go to Sedona and tour Tlaquepaque for the afternoon. Pearl had her nails done for the occasion:



First stop was the "Secret Garden" for lunch.


Then we were off to explore the venue and take in the sights, sounds and smells...


We visited Ken Rowe's sculpture gallery and talked with Ken and Monica for awhile...


We even found a store named for us: "Diva"!


And if you know Licorice, you know she LOVES hats, and so she had to shop for one while we were there.


We were having so much fun, Pearl had to give Licorice a hug:


Then we met a lady who got down on the ground with the girls and started to give them massages. Just what they came for, spa treatment!


Yes, Pearl was relaxed


Then Licorice got a card for her friend and decided to sign it with a nose print, using lipstick of course



The our spa treatments...here's Licorice still in her towel


Then off to a party, we were very popular and many people were taking our photos.


Pearl had a little too much to drink though...


We had a great time and we're planning the next event...wine tasting!


THE END

Tuesday, May 24, 2011

I Still Don't Understand How APS Does Their Calculations

Every month APS has a little chart in their online billing site. It purports to show a summary of the bill and how you use the energy purchased from APS. Part of that is a comparison of "my home" to "the average home". A recent month showed "my home" used $11 and "the average home" used...$11. Yet "my home" uses more energy than "the average home" according to this same chart. Yeah. Like the average home uses $11 worth of electricity a month. Check your bill. And since when is $11 more than $11?

And if you take their breakdown of where the money goes, it adds up to $23. Don't know where they studied math, but it sure doesn't match what we do in "my home".

Scroll down for the latest case of insanity...



OK, here's the current month. This time "my home" and "the average home" both used $9. Yet the two points on the chart aren't aligned. "My" $9 is higher on the chart, does that mean my money is worth more???

And this month, my $9 is made up of components that total $28. So I use less and it's worth even more? Is there anyone out there who works for APS that can explain this total nonsense?

Monday, May 23, 2011

Drilling Begins (At Last!)

We had a delay of a week due to some mechanical issues with the driller's truck. Another truck was brought out of storage and the remaining equipment was delivered today. A large air compressor trailer was hauled out to power the drilling unit. They arrived around noon (after delays going through Jerome) and worked until 5pm.


Above is the drilling tower, now upright.


The "business end" of the drill...check out the rotating teeth


Drill poised to begin


End of day, first bore underway. The foamy mud is a by-product of the water/air used to move things along. The excess goes into the ditch that was dug.



Here's the ditch with mud slurry in it.

End of the first drilling day!

Monday, May 16, 2011

Geothermal Day 1

The drilling rig has been delivered to the site. I expect drilling to begin tomorrow.



In the interim, the containment for the water slurry output of the drilling process has been dug out. There was an existing draining ditch in front of the property, though it was shallow (only about a foot deep at the deepest) it does run the length of the frontage. The driller needed a containment pond for the drilling slurry to sit in and evaporate. I suggested digging the drainage ditch deeper and to use it instead of digging something new. They agreed and today we have a draining ditch that goes five feet deep and about 65 feet long. After the water has evaporated (or been pumped to water the trees!), I will refill it to a depth of about 2 feet and line it with rock. This will improve the drainage and channel it to the open acreage area. (In my dreams there would be an underground cistern to hold a couple of thousand gallons of runoff water to use for irrigation...)


^ The drainage ditch before digging ^


^ Digging begins ^


^Completed digging: 5 feet deep and 60+ feet long ^

Wednesday, May 11, 2011

First Activity for the Geothermal Installation

The project kicks off!



First day of any work. Gravel has been cleared away for the utility locator markouts for any power/phone/gas/ etc. From the last three projects, I already know what's out there. No water, no sewer, no gas. Phone and power run a diagonal path from the transformer to the corner of the house...bypassing this area. The clearing was done around 8am.

Later today...


Verde Sol-Air's Dave Hudson came out to mark the locations for the three wells to be drilled. His work was captured by one of the security cameras...at 10:27am. No sneaking around here!

Now we wait for the locators to come and mark everything. I expect we will begin drilling Monday.

Stay tuned...